— Knowledge —
— PRODUCTS —
Email:susie@hnljpump.com
Mobile:+8618507312158
TEL:+8613974960765
vertical turbine pump
发布时间:2022/7/16 22:41:02 人气: [content:visits]
Start-up and Operation of VTP Series Vertical Long Axis Pumps
This pump is recommended to start by reducing pressure. Open the valve when starting. After the deep well pump is used, it is required to measure the static and dynamic water level of deep well frequently. Every start-up must be pre-run. When the motor stops, check the height of its lubricating oil surface. If it is insufficient, it must add enough oil.
Previous:Preparations for VTP Series Vertical Long Shaft Pumps before Operation
Next:Common Faults of VTP Series Vertical Long Shaft Pumps and Removal Methods
相关推荐
screenshots ,WeChat Scan the Qr Code
WeChat:ljpump6666